The RediPour team has continued work on a house in Damascus, finishing up one retaining wall while beginning the process of installing stairs and a front patio for the entrance area of the house.

After excavation occurred and rock was placed and compacted to provide a sturdy base for our RediPour wall, our robotic laser was set up to start the install of our RediPour wall.

The RediPour wall was then set into place and installed in two hours. After doing a preliminary check to ensure that everything was situated, a concrete line pump was used to pump the concrete from the truck into our wall.

The job is now ready to move on to the next stage, where another RediPour wall will be placed and poured on top of the base wall to prepare for the installation of the stairs. Check out the photos below and we will keep you posted as this job progresses. (Included is a peek at a version of our Top Cap which will be covered in our next "RediPour Visual Guide").




The Dig






Pre-pour with the wall in its skeletal form



The Pour. Notice very little bracing is needed to hold the forms in place



Smoothing the top of the RediPour wall 



Top Cap samples being poured for future customers



Outside wall after pour




Inside of the wall after the pour


No comments:

Post a Comment