Recently, we showed you the beginning stages of a front entrance patio RediPour is installing in Damascus, OR. The process is now near completion after the patio floor and the stairs were poured this week. 

The patio is made up of two separate RediPour retaining walls with stairs running along the wall and leading up to the front door. The patio floor is stamped out to give it a more natural look. The stairs, like the walls, were manufactured using RediPour technology. 

As you can see in the photos below, the RediPour crew installed and poured each wall in a day. What was once nothing but dirt and debris is now a modern patio that will add value and a beautiful look to the home. Below you will see a realistic view of the project that was created with information gathered by our robot and visualized by our designers. Compare that view with the photos below to see how the project goes from a computer design into a real-life wall.

A realistic view of the project created by our designers prior to the project


Walls being set

Walls set for the pour

A view of the stairs before the pour

RediPour Crew working on the stairs

A view of the newly poured patio floor

The stairs

A look at the carved patio

An up close look of the new patio